hi.videoSay hi

For consultants and freelancers

How to rehearse a client event with a working run of show

At a book festival, the host introduces the translator and the projection operator advances to the next cover. The translator is still taking a seat, so the host repeats the introduction just as a slide for the following book appears. Everybody knew the agenda. Nobody knew which words were the cue to change slides.

Write the transition from both sides

Take the five minutes between a panel and the translator's talk. In the audience agenda this might appear as "2:15, translation workshop." In the run of show it needs more detail. Who clears the panel's chairs? Who confirms the translator is at the lectern? Which slide should be up while the room moves?

Write an example row in full. "When stage lead says 'lectern ready,' host walks on and introduces translator. Projection holds the workshop title until translator says 'first page,' then opens excerpt slide one." You now have a trigger the operator can actually hear and a visible state everyone can check.

Use a column for elapsed or scheduled time, but ask what happens if the panel ends late. Advancing slides automatically at 2:15 would be unhelpful while the panelist is still speaking. For this passage the trigger matters more than the printed minute. Mark the event lead as the person who can shorten the transition or adjust the next slot.

Rehearse the awkward part

Put three cards on a table labeled host, stage lead and projection. Use a fourth card for the workshop title. Move the cards through the sequence while saying the cues. This is a cheap way to find a missing action before the team gathers in the room.

Record a sample of the transition if the team works different shifts. Keep the shot on the four cards and make clear which words are actual cues and which are commentary. A line like "When I say first page, that's the cue" could itself confuse an operator during rehearsal. Introduce the instruction, pause and then act out the sequence cleanly.

The title stays on screen while the stage lead checks the lectern. Stage lead: "Lectern ready." Host introduces the translator. The translator begins, pauses, then says, "First page." Projection changes to the excerpt. The person who can see the excerpt on the room screen confirms that the correct slide is up.

A demonstration prepares the team for rehearsal. It doesn't establish that the operator can hear the translator from their actual position. Try it in the room with the intended equipment and a stand-in if the speaker is unavailable. Find a visible fallback cue if the operator can't reliably hear those words.

Decide how a late start changes the sheet

Imagine the panel runs seven minutes over. Ask the event lead what can shorten and what has to stay. A long host biography might be optional. Giving the speaker time to reach the lectern is part of the transition itself. Record the actual fallback and who may call it.

If the translator is absent, the event lead might direct the host to take audience questions while projection holds the festival title. Put that instruction beside the affected row. Someone scanning the sheet in a dark booth shouldn't have to search through an earlier email for the alternative.

Hand over one current running order

After rehearsal, give the revised run of show a version and distribution time. List the holder of each role and the channel the team will use for day-of changes. If people print the sheet, ask them to replace old pages and mark any change made after printing.

Before doors open, take the handoff once more using only the sheet. If the projection operator can name the holding slide, the spoken cue and the fallback, the document is doing its job. For a longer operation involving several handoffs across days, the workflow mapping guide shows how to trace the same questions without timecoding an entire event.

Questions people ask

Is a run of show the same as an audience agenda?

A run of show includes backstage cues, responsibilities and timing. The audience agenda usually needs the sessions and times that affect attendees.

What if the running order changes on event day?

Give one person responsibility for updating the current sheet and announcing the revision. Confirm the affected cues with the people who act on them.

Who should attend the rehearsal?

Include the people who call or perform the important transitions and anyone authorized to choose a fallback when timing or equipment changes.

Prefer plain text? This article is also available as Markdown.