# How to write a clarification question for an RFP

Ask a neutral RFP clarification question that connects a specific requirement to a bid decision. Includes examples for quantities, scope and answer deadlines.

By Pranav Reddy, founder of hi.video. Edition dated 2026-08-22. Published 2026-11-23, updated 2026-11-23. Canonical page: https://hi.video/blog/rfp-clarification-question-example

## Short answer

Quote or identify the exact requirement, describe the ambiguity briefly and ask for the information all bidders need to price the same work. Submit through the channel and within the question window the issuer specifies. Keep confidential solution details and speculative claims about other bidders out of the question.

A request for proposals asks suppliers to deliver “a set of signs at each entrance.” The site plan shows five public entrances and three service entrances. A bidder might price five signs, eight signs or several signs per entrance. A clear question is worth more here than an elegant explanation of how your sign shop estimates a job.

## Find the line that changes the bid

Write down which decision depends on the answer. In the entrance example, quantity changes design time, materials and installation visits. The question is about which entrances and which sign types to include. The issuer does not need a history of your conversations with an installer or a reminder that ambiguous quantities can lead to surprises.

Read the whole request first, including schedules, drawings and any addenda already released. A separate drawing key might specify that a “set” means a wall sign and a window decal. If the documents resolve the issue, mark the answer in your working estimate. Repeated questions about items already specified add work for the buyer and can use up a short clarification window.

For a public example, the United Nations Global Marketplace directs suppliers to send written questions to the issuing organization. Its guidance explains where to find the specified contact and how written answers reach bidders. [UNGM tender clarification instructions](https://help.ungm.org/hc/en-us/articles/360012912639-How-to-submit-a-request-for-a-tender-clarification).

## Submit a question that can be answered exactly

> Section 4.2 requests one sign set at each entrance. Drawing A lists public entrances P1 through P5 and service entrances S1 through S3. Should bidders include all eight entrances or only the five marked public? Please confirm the sign types included in one set.

The issuer can answer by identifying a count and a definition. If these are separate fields in the portal, submit separate entries with the same section reference. Give neutral choices where the documents support them. If there may be another interpretation, leave space for it by asking for the included entrances by identifier.

Another example concerns access. “The schedule identifies a two-day installation window. Are installers able to work during public opening hours on those days, or is work limited to the hours after closing?” The answer changes staffing and lifts. Asking “will the buyer pay for overtime?” jumps ahead of the missing fact you need for your quote.

## Keep a question register inside the bid team

Use a simple row with the document reference, exact question, date sent, owner and effect on the bid. Leave a place for the issuer's answer and the item someone must change afterward. When an addendum says only public entrances are in scope, the person estimating labor and the person completing the price schedule both need the update.

If your designer wants to explain the confusion to an estimator, [record an internal walkthrough](https://hi.video/app) with an invented or shareable sample drawing. The issuer's published process may allow only written portal submissions. Keep the official question in that format. An unrequested presentation sent to an evaluator can make it harder for the buyer to keep the competition fair.

## Use the official answer throughout the proposal

Suppose the response says five public entrances, each with a wall sign and a decal. Translate that into the estimate as five wall signs and five decals. Check whether the installation schedule changes with that quantity. If the buyer sends a replacement price form, use the specified version and preserve the original response in your team's record.

For an unanswered question, decide how to proceed under the particular instructions. Some requests invite a clearly stated assumption. Others require an unqualified offer against a fixed scope. A note hidden in an appendix may leave your team exposed to work it never priced. Escalate the uncertainty to the person authorized to decide whether to submit.

The same habit applies when you're helping a buyer put together a [vendor comparison scorecard](https://hi.video/blog/vendor-comparison-scorecard). Each supplier needs an intelligible task and a common basis for comparison. A clarification that names the entrances and counts the pieces improves the price your own shop can offer and makes the buyer's eventual comparison easier to understand.

## Questions people ask

**Can I call someone I know on the buying team?**

Follow the communication instructions in the request. Where questions must go to a designated contact or portal, use that route.

**Should I suggest my preferred interpretation?**

Offer a neutral interpretation if it makes the ambiguity easier to correct. Avoid rewriting the requirement around your product or disclosing your bid.

**What if the issuer does not answer before the deadline?**

Follow the bid instructions for assumptions, exceptions or withdrawals. Record the unresolved point and ask the bid owner whether a compliant offer is possible.