# How to decline an RFP with a short no-bid letter

Write a no-bid letter that respects the buyer’s process. Includes separate replies for capacity limits, a scope mismatch and an invitation you hope to receive again.

By Pranav Reddy, founder of hi.video. Edition dated 2026-10-24. Published 2026-11-23, updated 2026-11-23. Canonical page: https://hi.video/blog/no-bid-letter-for-an-rfp

## Short answer

Send a brief no-bid notice through the issuer’s specified channel as soon as you have decided. Identify the procurement, state that you will not submit and give a concise reason if appropriate. Mention future opportunities only when you can describe the kind of work you genuinely want to be invited to.

A regional arts organization invites your fabrication shop to bid on a touring exhibition. You could build the cases, but the request also requires transport and installation at every venue. Your team has decided it can't take responsibility for that route. Leaving the invitation unanswered saves a minute today and leaves the buyer waiting for a proposal you already know will never arrive.

## Make the internal decision first

Distinguish a firm limit from an unanswered question. If the request explicitly allows separate fabrication bids, the project may still suit your shop. If the documents conflict on whether transport is mandatory, submit a [clarification through the named channel](https://hi.video/blog/rfp-clarification-question-example). Once the requirement and your decision are clear, stop assigning estimating time to the job.

Note who has authority to decline. An estimator who personally dislikes a tight schedule may be raising a risk for the bid lead to assess. The decision belongs to the person responsible for capacity and commitments. In the arts example, ask the shop manager whether it could work with a qualified transport partner within the terms offered. If the answer is no, a prompt notice is kinder than a late, speculative price.

Some buyers explicitly request a notice when a supplier will pass. The United Nations Global Marketplace includes that instruction in its tips for suppliers preparing bids for UN organizations. [UNGM supplier guidance](https://help.ungm.org/hc/en-us/articles/360012935459-Practical-tips-for-doing-business-with-the-United-Nations).

## A no-bid letter for the wrong scope

> Subject: Touring exhibition cases, no-bid response
>
> Thank you for inviting our shop to respond to the touring exhibition cases request. We have reviewed the fabrication, transport and multi-venue installation requirements and will not submit a bid for this procurement. Our shop can take responsibility for the case fabrication, but we do not offer the required touring installation service.
>
> We appreciate the invitation. Please consider us for future fabrication-only requests should those arise.
>
> Rowan, workshop manager

Use the procurement title and reference number the buyer supplied. Keep the note short enough to copy into the issuer's register. If the portal has a decline field with a choice of reasons, follow that process. A separate paper letter may be unnecessary.

## Wording for a temporary capacity problem

> We're declining the autumn map-cabinet request because the required assembly period overlaps a production commitment. We could not take the order on the schedule specified. We'd welcome the opportunity to consider future cabinet work beginning after November.

The buyer learns when it might make sense to call again. They don't need the name of the other customer, details of that contract or a long account of your staffing difficulties. Don't imply the buyer should postpone the procurement just to accommodate your production calendar. If they independently reopen the schedule, you can review the new terms at that point.

For a longstanding contact who values hearing from the shop owner, you might [record a brief thank-you](https://hi.video/app) separately if the buyer permits that communication. Keep the actual decision in the official notice. A person administering a procurement needs a written status they can file, even if they never open a personal message.

## Leave an accurate record of what you declined

Save the invitation reference, decision date and reason in your internal opportunity record. “Fabrication work suitable, touring installation beyond scope” is more useful than “lost.” It tells the next person what to do when the organization issues another invitation. It also keeps a future salesperson from describing the bid as one you submitted and failed to win.

If you learn of a capable partner later, check what stage the process has reached before trying to reopen it. A buyer may have closed submissions or moved into evaluation. Contacting individual panel members to float an alternative arrangement can create work for everyone and put your existing relationship in an awkward position.

A short no-bid response can be a complete professional interaction. In this example the arts organization can remove the shop from its list for the touring package while keeping it on file for a gallery that needs cases built in one place. The outcome reflects the work the shop can actually deliver.

## Questions people ask

**Do I need to explain why we decided not to bid?**

Follow the invitation’s instructions. A short factual reason can help the buyer maintain its supplier list when sharing that reason is appropriate.

**What if we already registered interest?**

Update the portal or notify the named contact as directed. Registering interest and submitting a signed offer can have different consequences.

**Can I ask to be included in future invitations?**

Yes, when you can say what scope or timing would be a better fit. Give the issuer a concrete way to classify future requests.

Related: https://hi.video/blog/rfp-clarification-question-example, https://hi.video/blog/disqualify-a-poor-fit-prospect
