# How to draw a clear boundary around phase one of a project

Use a small booking journey to decide what belongs in phase one, show where the handoff happens and give the client a useful list of work for later.

By Pranav Reddy, founder of hi.video. Edition dated 2026-11-14. Published 2026-11-23, updated 2026-11-23. Canonical page: https://hi.video/blog/define-phase-one-project-scope

## Short answer

Describe phase one as a journey someone can finish. Mark the exact point where the new work stops and an existing process takes over. Show one example from start to finish, list the exceptions and ask the client to confirm that somebody can operate the handoff.

"We'll launch bookings first and add the rest later" sounds tidy until someone asks whether booking includes payment, cancellations and confirmation emails. In a project for a pottery studio, the word might mean that a visitor can request a class, or it might mean that the visitor owns a paid seat. Those are quite different promises to print on a button.

## Follow a single seat through the proposed service

Use a fictional Saturday wheel class with one seat available. A visitor opens the class description, chooses a date, enters their contact details and presses a button. A studio assistant checks the request against a paper register and replies during office hours. Only the assistant can confirm the seat.

Draw a line after the submitted request. Put "new request form" on the left and "existing register and staff reply" on the right. On the form, use words that match how the studio actually works. "Request a place" and "We'll reply during office hours" make sense. A screen that says "Your seat is booked" would promise something the form can't deliver.

Walk through what happens if two visitors request the last seat. Both can receive acknowledgments. The studio assistant still needs to check the register and tell one person about another class. If the client considers that unacceptable, you have discovered a scope question before building an elaborate confirmation screen.

## Write down the boundary and the handoff

> Phase one lets a visitor request a place in a listed Saturday class. The studio receives the contact details and class date through the agreed staff channel. The assistant confirms availability from the register. The visitor sees that a request was received and when to expect a reply.

Below it, add a short list of later ideas: automatic seat allocation, online payment and self-service cancellation. For each, write the problem it would solve. "Avoid two people expecting the same seat" is a reason that can be evaluated. "Improve booking experience" doesn't tell the client which change to buy with their next week of work.

Write down what the existing process must supply. Someone has to update the class list, check incoming requests and respond when the assistant is away. One blank cell in the ownership column might matter more than the whole later list. If the studio closes for a week, what will the visitor see?

## Show the moment where the promise changes

Place the sample request screen beside the staff's blank register. On a supported desktop browser, [record a walkthrough](https://hi.video/app) and move the pointer from the submitted request to the waiting row in the register.

> At this point our visitor has asked for the Saturday wheel class. Here's the request in the staff queue. There's still one check before we promise the seat, and that's the register on your desk. Is an acknowledgment followed by a staff reply acceptable for the first release? If it is, I'll write that into the confirmation page and the review checklist.

Send the underlying sketch. The studio manager can show it to the person who covers the office on Saturdays. A video answers "what are we proposing?" The person at the desk can answer "could we do this between classes?" Those questions draw on different kinds of knowledge.

## Use the boundary when new ideas arrive

When a tutor asks whether visitors can switch between dates online, point to the exact crossing. A date change currently goes to the assistant. Discuss the volume and difficulty of those requests before deciding whether to move that step into phase one. Keep the question in the later list with the tutor's reason.

End the scoping conversation with a small rehearsal. Give someone the fictional last-seat request and ask them to explain what the visitor receives and who acts next. If they still say the seat is automatically confirmed, change the wording or the boundary drawing. Use the [estimate range guide](https://hi.video/blog/explain-a-project-estimate-range) once you know which tasks need an allowance.

## Questions people ask

**How do I decide what can wait for phase two?**

Test whether the primary user can finish the agreed task without the feature. Identify who handles any remaining work and whether that is practical.

**What if the handoff creates too much work for staff?**

Revise the boundary or narrow the intended audience. A manual handoff needs an owner who can actually do the work at the expected times.

**Does putting a feature in a later list promise delivery?**

Label the later list as ideas to evaluate and say which work is currently agreed. Confirm timing separately when the client chooses another phase.

Related: https://hi.video/blog/project-brief-questions-for-clients, https://hi.video/blog/explain-a-project-estimate-range