# How to build a client approval matrix that works in practice

Use an exhibition guide to distinguish factual checks, editorial decisions and release approval. Test the matrix on a late correction before production.

By Pranav Reddy, founder of hi.video. Edition dated 2026-11-17. Published 2026-11-23, updated 2026-11-23. Canonical page: https://hi.video/blog/client-approval-matrix-example

## Short answer

List the decisions a project needs, then assign who prepares each item, who checks specific facts, who can approve it and where the approval is recorded. Test the matrix with one late change. Ask the client to resolve rows with competing owners or no available approver.

Everyone is on the email about an exhibition guide. The curator replies "fine," the editor fixes a spelling error and the venue director asks why the cover went to print. The size of the recipient list didn't answer the question that mattered: who can release the file?

## Build the rows from decisions

For an imaginary gallery guide, pick three decisions that could come up even on a quiet project. Is the date under a borrowed photograph correct? Is the short introductory text ready? May the designer release the current print PDF? These questions require different kinds of knowledge and authority.

| Decision | Prepare | Check | Approve |
| --- | --- | --- | --- |
| Caption date | Project editor | Collection researcher | Curator |
| Introductory text | Writer | Project editor | Curator |
| Release print PDF | Designer | Production lead | Venue director |

Use role names first and put the actual people and agreed deputies in the working copy. A consultant or agency can recommend a division of responsibilities. The client needs to confirm that the named people really have those responsibilities. If the venue director has delegated print release to production, fix the matrix now.

Add a place for the approval record. The caption might live in the copy sheet and the release approval in the project's existing signoff system. Put the specific location or document name in each row. A reply of "fine" in an unrelated chat should never be someone's only clue that a printer may receive a file.

## Test the matrix with a late correction

Imagine that the collection researcher spots a wrong year under photograph 14 after the curator has approved the introductory text. Follow the correction across the rows. The researcher supplies the corrected year and its source, the editor changes the caption, the curator checks it and the designer generates a fresh proof. The venue director needs the identity of this new proof before giving release approval.

If everybody on the email thinks the correction goes straight to the printer, the problem is visible while there's still time to fix it. Add a rule in ordinary language: "A change to a caption after proof approval requires a new proof and release decision." If the client already has a policy, use their wording and link to its current location.

For small projects you may have one person wearing several hats. List that person in each relevant cell. The exercise still helps because you're distinguishing the particular act they are approving. A curator can accept the updated caption today and hold the print release while another photograph is being cleared.

## Explain the one row people tend to misread

Open a sample matrix and the fictional proof G3. [Record a short walkthrough](https://hi.video/app) while tracing the print release row from left to right.

> Our designer prepares G3 and production checks it. The director's reply against this version is the instruction to release it. When the curator approves a caption, that closes the caption row. Could you check who covers the director's role on Friday? That's the one cell I still have open.

In the accompanying note, ask each approver to confirm only their rows. A researcher shouldn't have to certify the venue's delegated authority just because they received the clip. If the proposed deputy hasn't been authorized, leave the cell open and state what work would wait.

## Keep the matrix close to the work

Attach or link the current matrix to the review request. Include the version of the item under review, the action requested and the time the decision is needed. When someone forwards a proof without the original conversation, the next reader can still find the right route.

At the first review, watch for questions arriving with the wrong person. If every caption goes to the director, check whether the row is unclear or whether the client has quietly changed its internal process. Date any agreed revision to the matrix and let affected people know. For the wording of an individual choice between two designs, use the [design feedback request example](https://hi.video/blog/design-feedback-request-email-template).

## Questions people ask

**What if two client departments both need to sign off?**

Record exactly which decision belongs to each. If both must approve the same release, make the joint requirement and escalation route explicit.

**Does every reviewer have approval authority?**

Define each reviewer's remit in the matrix. Someone who checks a date can supply a correction while another person owns the final release.

**How do I handle an approver's absence?**

Ask the client to identify an authorized deputy or a decision that must wait. Record the answer before the review period begins.